Structural Work in Sherman Oaks, in the Right Order

Sherman Oaks structural work runs in a set order, with the old wall opened and measured before a steel beam is ordered, then permitted and inspected.

Tell us about the room you need

By sending, you agree Silver Pine Remodeling may contact you by call, automated text or email about your request. Consent isn't required to buy. Msg & data rates may apply; reply STOP to opt out. Privacy Policy

A steel beam for a Sherman Oaks opening is cut to length only after the old wall has been exposed and measured, which puts a step ahead of the beam that is easy to miss: open first, measure second, order third. A drawing alone cannot say how far apart the walls really sit, or whether the posts on each side are plumb.

Measure, then order

Walls are rarely perfectly square, and ceilings sag a little over time. A beam drawn to nominal dimensions may be a half inch off in the field, which is enough to bind or leave a gap. So the engineer's drawing sets the size and strength, and the field dimensions set the cut length and the position of the end plates. Ordering after measuring avoids cutting or shimming a finished steel member in the field. The same trip with the tape also confirms ceiling height, so the beam depth can be settled with the room in view.

What follows delivery

When the beam arrives, the ceiling is already held on temporary supports and the old wall is down. The beam is lifted into place, bolted or welded as drawn, and the posts and footings beneath it are checked. Then the inspector comes. Only after that approval do the ceiling above and the floor below get patched and painted, so the evidence of the work stays visible for as long as it matters. Photos of the open steel are kept with the permit record.

About structural workEverything we do in Sherman Oaks

Structural Work in Sherman Oaks: what families ask

Your Sherman Oaks project, start to finish

Tell us about the house and the space you need. We reply by phone or email to plan a visit.