A sheet of plastic goes up across the doorway before any saw comes out on a Valley Glen job, and that sets the order for everything after it. Dust containment comes first, then temporary support under the ceiling, then the opening, then the beam. Each step makes the next one safe, and each leaves the rest of the house usable for the people who still live in it.

Support, then cutting

Once the plastic wall is in, temporary posts and a header beam go up on both sides of the wall that is coming out. They carry the ceiling and whatever sits above it while the old studs are cut away. The new beam is lifted into the opening and bolted to its posts, and only then do the temporary supports come down. The circuit that fed the wall was turned off at the panel and labeled beforehand, so nobody works around a live wire.

Keeping the house in use

Living through a structural job is easier when the plan keeps three things working: a path to the bathroom, a place to cook and a door that locks. We lay out the work zones so those stay available, and we say in advance which days a room will be closed, so a missing hallway never comes as a surprise. When the beam is set and inspected, the plastic comes down, the ceiling is patched and the room is cleaned before it goes back into use.

About structural workEverything we do in Valley Glen

Structural Work in Valley Glen: what families ask

Other projects we take on in Valley Glen

Your Valley Glen project, start to finish

Tell us about the house and the space you need. We reply by phone or email to plan a visit.