Structural Work in Santa Clarita, Kept Dry From the Roof Down

New beams, footings and second-story framing for Santa Clarita houses, with flashing and drainage planned so water stays off the new structure.

Tell us about the room you need

By sending, you agree Silver Pine Remodeling may contact you by call, automated text or email about your request. Consent isn't required to buy. Msg & data rates may apply; reply STOP to opt out. Privacy Policy

The seam where a new second story meets the roof beneath it is where water is most likely to find the framing of a Santa Clarita addition, so flashing, roof edge and downspout route are drawn up at the same time as the beams and footings. A hard storm tests that seam quickly, and once the walls are closed it is difficult to reach.

Flashing where old roof meets new wall

As the new wall rises from the old roof, step flashing is woven into the roofing course by course, with a kickout at the bottom so water leaves the wall surface and drops into the gutter. Housewrap laps over the flashing from above, and the new siding or stucco stops short of the roof surface, leaving a gap that keeps wicking away. These details are drawn on the framing sheets so the roofer, framer and plasterer all work from the same picture.

Water at the base, embers at the edge

At the other end of the house, downspouts are piped away from the new footings, and the soil beside the foundation is graded so water runs off the lot. A lot in Santa Clarita can fall inside a mapped fire hazard zone, which may bring ember-resistance rules to the same edges where water is managed: vents, eaves and gutters. Metal gutter guards and vents covered in fine mesh are choices to settle during design, when the roof edge is being reworked anyway.

About structural workEverything we do in Santa Clarita

Structural Work in Santa Clarita: what families ask

Your Santa Clarita project, start to finish

Tell us about the house and the space you need. We reply by phone or email to plan a visit.